18.09.2023
Photos
18.09.2023
Photos
18.09.2023
Photos
14.09.2023
Flyers
22.08.2023
Flyers
22.08.2023
Flyers
04.08.2023
Minutes
20.07.2023
Minutes
10.07.2023
Films
10.07.2023
Minutes
03.07.2023
Flyers
03.07.2023
Films
28.06.2023
Graphics, Maps
28.06.2023
Flyers
19.06.2023
Flyers
09.06.2023
Presentations
26.05.2023
Photos
26.05.2023
Photos
26.05.2023
Photos
26.05.2023
Photos
06.03.2023
Minutes
06.03.2023
Presentations
06.03.2023
Minutes, Presentations
09.01.2023
Minutes
09.01.2023
Minutes
16.12.2022
Films
06.12.2022
Presentations
02.12.2022
Films
01.12.2022
Presentations
24.11.2022
Minutes
24.11.2022
Presentations
04.11.2022
Presentations
01.11.2022
Minutes
16.09.2022
Presentations
16.09.2022
Presentations
16.09.2022
Presentations
16.09.2022
Presentations
16.09.2022
Presentations
16.09.2022
Presentations
01.09.2022
Flyers
26.08.2022
Photos
15.08.2022
Minutes
15.07.2022
Minutes
15.07.2022
Minutes
05.07.2022
Films
24.06.2022
Minutes
20.06.2022
Flyers
13.06.2022
Photos
09.06.2022
Minutes
10.05.2022
Maps
18.03.2022
Photos
18.03.2022
Photos
18.03.2022
Photos
18.03.2022
Photos
18.03.2022
Photos
18.03.2022
Photos
18.03.2022
Photos
15.03.2022
Photos
15.03.2022
Photos
15.03.2022
Photos
15.03.2022
Photos
15.03.2022
Photos
14.03.2022
Minutes
10.03.2022
Flyers
25.02.2022
Minutes
18.02.2022
Flyers
Rundgang eines grenzüberschreitenden Wanderwegs und Tagung der AG Erkundungsweg im Januar 2022 Foto: DB AG / Natalie Klein 09.02.2022
Photos
16.12.2021
Minutes
19.11.2021
Minutes
11.11.2021
Maps
11.11.2021
Flyers
05.11.2021
Presentations
21.07.2021
Films
29.06.2021
Films
Process of parliamentary scrutiny (DB AG) 31.05.2021
Graphics
From idea to project completion 27.05.2021
Graphics
Overview of responsibilities (DB AG) 27.05.2021
Graphics
The rail link between Dresden and Prague is on the Orient/East-Med European TEN-T Corridor. It connects the German ports on the North Sea and Baltic with economic centres in south-eastern Europe. (Deutsche Bahn AG) 12.05.2021
Maps
Overview of potential noise reduction measures (DB AG) 10.05.2021
Graphics
The two pillars of the overall concept/DB AG 10.05.2021
Graphics
08.05.2021
Flyers
Route map of new Dresden–Prague line (DB AG/SŽDC) 08.05.2021
Maps
07.05.2021
Minutes
06.05.2021
Flyers
05.05.2021
Photos
Bohrkernlager in Pirna
© PTB Magdeburg GmbH/Michael Oertel
05.05.2021
Photos
Bohrkernlager in Pirna
© PTB Magdeburg GmbH/Michael Oertel
05.05.2021
Photos
Bohrkernlager in Pirna
© PTB Magdeburg GmbH/Michael Oertel
05.05.2021
Photos
Bohrkernlager in Pirna
© PTB Magdeburg GmbH/Michael Oertel
Passing loop under construction at the eastern portal to the Finne Tunnel/DB AG 05.05.2021
Photos
05.05.2021
Flyers
05.05.2021
Presentations
21.01.2021
Films
19.01.2021
Films
07.01.2021
Minutes
17.12.2020
Photos
17.12.2020
Photos
17.12.2020
Photos
15.12.2020
Films
Zwei-Säulen-Strategie beim Lärmschutz 15.12.2020
Graphics
Bund und DB vereinbaren neues Lärmschutzziel für 2030 – Sämtliche DB-Güterwagen auf leisen Sohlen unterwegs | Deutsche Bahn AG 15.12.2020
Photos
Präsentation Auftakt Arbeitsgruppe Erkundungsweg am 25.11.2020 07.12.2020
Presentations
Präsentation Auftakt Arbeitsgruppe Erkundungsweg am 25.11.2020
17.11.2020
Minutes
28.10.2020
Minutes
20.10.2020
FAQ
Präsentation Online-Informationsveranstaltung am 7. Oktober 2020 14.10.2020
Presentations
Behind the scenes of the first online information event (DB Netz AG) 14.10.2020
Photos
Heidenau working group in the town on 30 September 2020 (DB Netz AG/Susann Holtorp) 13.10.2020
Photos
Corridors being investigated (DB AG) 03.10.2020
Graphics, Maps, Regional planning procedure
After the signing of the letter of intent at the EGTC (from left to right): Dr Frank Fischer (head of geology at the LfULG), Dr Marcus Schenkel (head of infrastructure projects at Regional Unit Southeast, DB Netz AG), Kay Müller (project manager, Dresden–Prague new-build line project, DB Netz AG) and Norbert Eichkorn (president of the LfULG) 30.09.2020
Photos
22.09.2020
Flyers, Press releases
04.09.2020
Presentations
03.09.2020
Presentations
03.09.2020
Photos
03.09.2020
Photos
03.09.2020
Photos
03.09.2020
Photos
03.09.2020
Photos
03.09.2020
Photos
03.09.2020
Photos
03.09.2020
Photos
03.09.2020
Minutes
26.08.2020
Regional planning procedure
26.08.2020
Regional planning procedure
26.08.2020
Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Regional planning procedure
26.08.2020
Regional planning procedure
26.08.2020
Regional planning procedure
26.08.2020
Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Regional planning procedure
26.08.2020
Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Maps, Regional planning procedure
26.08.2020
Presentations, Regional planning procedure
26.08.2020
Regional planning procedure
© DB AG 22.08.2020
Photos
20.08.2020
Photos
20.08.2020
Photos
20.08.2020
Photos
20.08.2020
Photos
20.08.2020
Photos
03.08.2020
Regional planning procedure
Dynamic probing rig with pneumatic hammer (Institute of Geotechnical Engineering, TU Dresden) 30.07.2020
Photos
Drilling the Apfelallee borehole in Heidenau (vectorvision GbR) 17.07.2020
Photos
Groundwater measuring point on the industrial estate in Heidenau (DB AG/Vladislava Kostkanová) 17.07.2020
Photos
Core samples from Pechhütte bus stop in Heidenau (DB AG/Vladislava Kostkanová) 17.07.2020
Photos
Drilling work at Pechhütte bus stop in Heidenau (DB AG/Vladislava Kostkanová) 17.07.2020
Photos
Overview of responsibilities between DB Netz AG and Správa železnic 15.07.2020
Graphics, Maps
Overview of boreholes_added detail July 2020 06.07.2020
Graphics, Maps
Illustration of the tunnel-building process/ DB AG 03.07.2020
Graphics
Standard cross-section of tunnel built by mechanised tunnel driving/DB AG 02.07.2020
Graphics
Heidenau–Ústí nad Labem route map (DB AG) 01.07.2020
Maps
Surveying work (Deutsche Bahn AG) 01.07.2020
Photos
26.06.2020
Photos
© DB AG 26.06.2020
Photos
Drilling rig for the first borehole on the industrial estate in Heidenau (DB AG/Susann Holtorp) 26.06.2020
Photos
Experts at the drilling site inspect the core samples (DB AG/Susann Holtorp) 26.06.2020
Photos
26.06.2020
Photos
Staff from the company Pruy KG remove the core samples on Heidenau industrial estate (DB AG/Susann Holtorp) 26.06.2020
Photos
Site of borehole at Pechhütte bus stop in Heidenau (DB AG/Susann Holtorp) 26.06.2020
Photos
Site of borehole by Apfelallee in Heidenau (DB AG/Susann Holtorp) 26.06.2020
Photos
26.06.2020
Photos
Boxes of core samples from Heidenau industrial estate (DB AG/Susann Holtorp) 26.06.2020
Photos
Boxes of core samples from the first borehole on Heidenau industrial estate (DB AG/Susann Holtorp) 26.06.2020
Photos
Drilling rig belonging to Pruy KG in Heidenau (DB AG/Susann Holtorp) 26.06.2020
Photos
Borehole information sheet for drilling area 3 in the Eastern Ore Mountains investigation area 25.06.2020
Flyers, Presentations
Existing lines in the area of Heidenau-Großsedlitz (DB Netz AG/ Susann Holtorp) 24.06.2020
Photos
Marking drilling sites (DB Netz AG_Vladislava Kostkanová) 23.06.2020
Photos
Landwüst drilling site (PRUYKG-Gesteins-Bohr-und-Umwelttechnik) 19.06.2020
Photos
Rotary core drilling rig (PRUY KG, Gesteins-, Bohr- und Umwelttechnik) 19.06.2020
Photos
Hand drill (GEPRO Ingenieurgesellschaft mbH) 19.06.2020
Photos
Borehole information sheet for drilling area 1 on Heidenau industrial estate 17.06.2020
Flyers, Presentations
Borehole information sheet for drilling area 2 on railway premises 17.06.2020
Flyers, Presentations
Start of subsurface investigations along the route of the new Dresden–Prague line 15.06.2020
Flyers
Phases of the project 14.06.2020
Graphics
20-05-13 Press release first tender 14.05.2020
Press releases
Press release on the publication of the invitation to tender for project management in the joint planning area 12.05.2020
Press releases
Information paper for members of parliament, dated 23 March 2020 06.04.2020
Presentations
The signed joint declaration dated 2 March 2020 on the new Dresden–Prague railway line 11.03.2020
Maps, Press releases
Signing of the joint declaration on the new Dresden–Prague line 03.03.2020
Photos
Additional questions and answers from the market consultation 13.02.2020
Presentations
List of participants market consultation 08.02.2020
Presentations
Frequently asked questions from the public meetings for the new Dresden–Prague line in January 2020 05.02.2020
FAQ
Michael Menschner (DB Netz AG) talking to residents at Pirna Town Hall on 28 January 2020 29.01.2020
Photos
Project managers from DB Netz AG and the State Directorate of Saxony talking to residents in Heidenau on 27 January 2020 29.01.2020
Photos
Brief description Option A 29.01.2020
Flyers, Maps
Brief description Option B 29.01.2020
Flyers, Maps
Brief description Option D 29.01.2020
Flyers, Maps
Brief description Option E 29.01.2020
Flyers, Maps
Brief description Option F 29.01.2020
Flyers, Maps
Brief description Option G 29.01.2020
Flyers, Maps
Brief description Option C 29.01.2020
Flyers, Maps
Presentation from market consultation 28.01.2020
Presentations
Leaflet on public meetings in 2020 03.01.2020
Flyers, Regional planning procedure
How can sonic boom be avoided? (DB AG) 21.12.2019
Graphics
DB submits documentation for the regional planning procedure concerning the new Dresden–Prague line (16 December 2019) 17.12.2019
Press releases
Minutes from the second dialogue forum on the new Dresden–Prague line_adopted on 16 December 2019 17.12.2019
Minutes
Presentations from the third dialogue forum on the new Dresden–Prague line in Pirna on 16 December 2019 16.12.2019
Presentations
New line through the Ore Mountains – Flyer December 2019 15.12.2019
Flyers
Part D: Additional report for regional planning procedure for new Dresden–Prague line 15.12.2019
Regional planning procedure
Part C: Regional planning study 13.12.2019
Regional planning procedure
Part B: Description of technical and traffic aspects for regional planning procedure 13.12.2019
Regional planning procedure
Part B Appendices 13.12.2019
Regional planning procedure
Heidenau–Ústí nad Labem route map (DB AG) 12.12.2019
Maps
Regional planning procedure for new Dresden–Prague line – Part A 12.12.2019
Regional planning procedure
Option G (infrastructure & environment) 12.12.2019
Maps
Option A (infrastructure & environment) 12.12.2019
Maps
Option B (infrastructure & environment) 12.12.2019
Maps
Option C (infrastructure & environment) 12.12.2019
Maps
Option D (infrastructure & environment) 12.12.2019
Maps
Option E (infrastructure & environment) 12.12.2019
Maps
Option F (infrastructure & environment) 12.12.2019
Maps
12.12.2019
Press releases
12.12.2019
Press releases
Dresden Hauptbahnhof 10.12.2019
Photos
10.12.2019
Press releases
Deutsche Bahn AG / Susann Holtorp 08.12.2019
Photos
Deutsche Bahn AG/Kai Michael Neuhold 08.12.2019
Photos
Overview of the expert reports required (DB AG) 08.12.2019
Graphics
Deutsche Bahn AG / Volker Emersleben 08.12.2019
Photos
Criss-crossing Europe: an EC train from Prague arrives at Berlin Südkreuz station (Deutsche Bahn AG/Volker Emersleben) 08.12.2019
Photos
VDE 8.1 – Work on the future track in the Eierberge Tunnel (Deutsche Bahn AG/Frank Kniestedt) 08.12.2019
Photos
Diagram of Koralm Tunnel (ÖBB) – Emergency stopping points 07.12.2019
Graphics
Tunnel tubes (SMWA) 07.12.2019
Graphics
Leaflet on subsurface investigations 07.12.2019
Flyers
Overhead line on open-air track (Deutsche Bahn AG) 07.12.2019
Graphics
Illustration of a railway embankment (Deutsche Bahn AG) 07.12.2019
Graphics
Sample drawings of bridges (2015 feasibility study SMWA) 07.12.2019
Graphics
Example design for the flyover at Heidenau (2015 Feasibility Study SMWA) 07.12.2019
Graphics
Example design for the flyover at Heidenau (2015 Feasibility Study SMWA) 07.12.2019
Graphics
Example design for the flyover at Heidenau (2015 Feasibility Study SMWA) 07.12.2019
Graphics
07.12.2019
FAQ, Regional planning procedure
07.12.2019
FAQ
Extract from regional planning documents on noise considerations 07.12.2019
Regional planning procedure
Bridge adjacent to Tunnel (SMWA) 22.11.2019
Graphics
Flyover at Heidenau (SMWA) 22.11.2019
Graphics
Comparison of slab track and traditional ballasted track (DB AG) 22.11.2019
Graphics
ETCS Level 2 (DB AG) 22.11.2019
Graphics
Drone flight Heidenau – Bad Gottleuba 25.10.2019
Aerial views
Geological longitudinal section of Option G (DB AG) 18.10.2019
Graphics
Second dialogue forum in Pirna in June 2019/DB AG 18.10.2019
Photos
Public meeting in Heidenau on 16 April 2019 (Deutsche Bahn AG/Susann Holtorp) 18.10.2019
Photos
Political information event in January 2019 (Deutsche Bahn AG/Susann Holtorp) 18.10.2019
Photos
Joint project management of the new Dresden–Prague line (Kay Müller (left) and Petr Provaznik/vectorvision GbR) 18.10.2019
Photos
DB Cargo in the Elbe Valley: Class 189 electric locomotive with a container train on the way to the Czech Republic against the backdrop of Saxon Switzerland 18.10.2019
Photos
18.10.2019
Graphics
Vibration from rail traffic/DB AG 18.10.2019
Graphics
The investigation area between Heidenau and Ústí nad Labem (DB AG). 18.10.2019
Maps
Illustration of the tunnel-building process/ DB AG 18.10.2019
Graphics
Standard cross-section of tunnel built by mechanised tunnel driving/DB AG 18.10.2019
Graphics
Nature reserves to be considered as part of planning/DB AG 18.10.2019
Graphics
Implementing wildlife conservation in the project/DB AG 18.10.2019
Graphics
First dialogue forum on the new Dresden–Prague line 18.10.2019
Presentations
Appendix to minutes of the first dialogue forum on the new Dresden–Prague line on 8 April 2019 18.10.2019
Minutes
Minutes to the first dialogue forum on the new Dresden–Prague line on 8 April 2019 18.10.2019
Minutes
Second dialogue forum on the new Dresden–Prague line on 26 June 2019 18.10.2019
Presentations
Minutes of the pre-application conference on 8 May 2019 18.10.2019
Minutes
Mission statement of the dialogue forum on the new Dresden–Prague line 18.10.2019
Minutes
Flyer: The new line through the Ore Mountains from Dresden to Prague 18.10.2019
Flyers
Building Information Modeling (BIM ) 13.10.2019
Films
04.10.2019
Flyers
04.10.2019
Flyers
Stages of the planning approval procedure (image: © DB AG) 02.10.2019
Graphics
Regional planning procedure (DB AG) 02.10.2019
Graphics
02.10.2019
Graphics